Heat was left too low resulting in a frozen pipe that burst, then flooded the space with steam and water. Upon removal of surface materials, customer opted for a more thorough renovation of the space, as much of the original structure was inadequate or unsafe to leave in place. Existing and unused chimney was removed allowing a more open floor plan. Foam insulation was added where there was none. Plumbing, heating and electrical issues were also addressed.